Home renovation cost in Toronto: 2026 prices by scope and room.
What a cosmetic refresh, a full gut renovation, or a single room actually cost, and the one renovation type that can genuinely qualify for a real HST rebate.
Every number here is a range, not a quote.
Renovation cost depends on scope and room far more than one blended rate. Every range below states its date and what it does and does not include.
Published GTA renovation pricing plus official fee schedules
Published September 2026
City of Toronto, CRA, StatCan, CHBA, plus GTA renovation specialists
Reviewed by ERA Premier’s project team
What different scopes of renovation actually cost.
Ranges based on published GTA sources, September 2026.
Cosmetic (finishes only, no structural or systems work)
$60–$150/sqft
Full spread $50–$150/sqft
Standard renovation
$150–$275/sqft
Full spread $100–$300/sqft
Major renovation
$280–$450/sqft
Full spread $275–$500/sqft
Full gut renovation
$450–$580+/sqft
Full spread $400–$600+/sqft
Scope, existing conditions and finish level decide where you land. Get a property and scope review for a number specific to your project.
How Development Charges apply to a renovation.
Like a home addition, a renovation within your home’s existing footprint generally does not trigger Toronto’s Development Charge, the City’s own exemption for enlarging or reconfiguring an existing dwelling unit applies here too, Development Charges are tied to new units and added floor area, not interior renovation work.
The one exception worth knowing: if your renovation creates a legal secondary suite as a new, separate dwelling unit, that can change the picture. Confirm this with the City for your specific project if that’s part of the plan.
What a single room, or the basement, actually cost.
For a renovation focused on one or two spaces rather than the whole home.
Kitchen
$25,000–$75,000
Cosmetic floor ~$15,000, high-end/custom $100,000–$150,000, luxury projects to $250,000+
Bathroom, powder room
$7,000–$14,000
Bathroom, standard 3-piece
$16,000–$27,000
Bathroom, mid/full ensuite
$33,000–$54,000
Bathroom, luxury
$45,000–$70,000+
Basement, basic/standard finish
$35–$95/sqft
Central range $45–$75/sqft
Basement, mid-range with bathroom
$55–$150/sqft
Basement, legal secondary suite
$90–$200+/sqft
Central range ~$100–$150/sqft
Room condition, layout changes and finish level all move these numbers. Get a property and scope review for a number specific to your project.
The real municipal costs a renovation does carry.
Building permit fee. $11.53 per square metre (about $1.07 per square foot) for interior alterations, effective January 1, 2026. Basement finishing carries its own distinct rate, $6.20 per square metre, a separate line item from general interior alterations, both published by the City of Toronto. Minimum fee $214.79, hourly rate for examination and inspection $92.79.
Zoning Review fee. $644.38 flat, for new houses, additions, conversions and alterations to houses, effective January 1, 2026, as published by the City of Toronto. Not every renovation needs this, it applies when the City needs to review the project against zoning requirements.
HST. A flat 13%, applying to most labour and materials, though see the tax section below, a true full gut renovation is the one renovation type that can offset part of it.
Where a renovation, unlike an addition, can genuinely qualify.
Ontario’s Enhanced New Housing Rebate and the existing GST/HST New Housing Rebate can return up to $80,000 combined, for a home valued up to $1,850,000, for a new build or a substantial renovation, construction starting between April 1, 2026 and March 31, 2027, substantially complete before 2030. The CRA defines substantial renovation as removing or replacing 90% or more of the existing building’s interior, not counting the foundation, exterior walls, interior load-bearing walls, floors, roof and staircases.
A true full gut renovation, the kind that strips a home down to structure and rebuilds the interior from there, is the renovation type most likely to reach that bar. A cosmetic refresh, a standard renovation, or even a major renovation limited to a few rooms usually won’t, the 90% threshold applies to the whole building’s interior, not just the rooms being touched. If you’re planning a true full gut, this is worth discussing with a qualified accountant before you assume it doesn’t apply to you.
What actually drives your price, beyond scope.
Contingency and labour on top of these: budget 10% for a cosmetic project, 15% for a kitchen, bathroom or whole-home renovation, and 25% or more for a pre-1960 home or a condo. Labour typically runs 40 to 50% of the total budget.
Structural wall removal
$2,000 to $10,000 including engineering and permits, for opening up a floor plan.
Plumbing stack or drain relocation
$2,500 to $5,000 per line, when moving a kitchen or bathroom’s location rather than renovating it in place.
Electrical work
Knob-and-tube rewiring in pre-1960 homes runs $10,000 to $25,000, a panel upgrade adds $1,500 to $2,500 more.
HVAC replacement
$13,000 to $15,000 for a full system, or $7,000 to $14,000-plus for a heat pump.
Location within Toronto
Scarborough, Etobicoke and North York run roughly 10 to 20% lower than downtown or Midtown for comparable scope, based on one published Toronto estimate, so treat it as a guide.
Pre-1960 home age
Renovations on pre-1960 housing stock commonly run 25 to 40% over the original budget once walls are opened.
Mold or asbestos remediation
Mold $4 to $5 per square foot, asbestos $6 to $18 per square foot, where applicable.
Temporary housing, for a full gut
One Toronto renovation guide puts an 8 to 12 week short-term rental during a whole-home gut renovation at $8,000 to $20,000 or more.
2026 pricing context.
Statistics Canada’s Residential Renovation Price Index showed Toronto down 0.5% quarter-over-quarter in Q1 2025, the only major Canadian market to decline that quarter, against a national increase of 0.3%. CHBA’s Renovation Market Index for spring 2026 puts Ontario’s subindex at 40.1, below the neutral midpoint of 50, a cooler renovation market than other regions right now. Cabinet pricing is one exception, a 2025 tariff on imported cabinetry has reportedly pushed cabinet costs up 15 to 25% versus mid-2025 pricing.
Why scope and room both matter to your number.
A cosmetic refresh, a full gut renovation and a single bathroom are different projects with different cost structures, which is why the costs above are shown two ways: by scope and by room.
Property and scope review
Start with the address, the home’s age and condition, and the goal.
Confirm scope vs. room
Whole-home scope tier, or a specific room, matched to what you’re actually trying to achieve.
Check what applies
Permits, a Zoning Review fee if needed, and whether a full gut makes the HST rebate worth pursuing.
Condition assessment
Home age, existing systems and any known structural or mechanical issues.
Real trade and consultant pricing
Once the scope is clear, real quotes replace these ranges.
Your number
A property-specific estimate, not an average.
Check what is included before comparing.
Use this table as a reading checklist, for our numbers or anyone else’s.
Area basis
The renovated area or room only, not your home’s total floor area, unless it’s a full gut project.
Confusing renovated area with whole-home area inflates or deflates the comparison.
Hard construction
Structure, systems and finishes for the scope tier or room you choose, see the tables above.
A construction-only price leaves out costs you’ll still have to pay.
Design and consultants
Not included for most scopes. A full gut renovation typically needs design and engineering input, priced separately.
The professionals you need depend on the property and the design.
Permits and fees
Not included. The building permit fee, and a Zoning Review fee where applicable, are separate, see the section above.
Fees and requirements depend on your project and your city.
Development Charges
Generally does not apply to a renovation, see the section above, unless the project creates a new dwelling unit.
Assuming Development Charges apply the same way as a new build would overstate a renovation’s real cost.
Taxes
Not included. HST is a flat 13%. A true full gut renovation is the one project type here that can genuinely qualify for a real rebate, see the tax section above.
Make sure both numbers include tax, or neither does.
Existing conditions
Structural, electrical and mechanical condition, especially in a pre-1960 home, can add real cost once walls are opened, see the drivers section above.
Tight sites and unknown conditions can add work a general price doesn’t cover.
Finishes and allowances
Defined by the scope tier or room tables above, not a single blended figure.
“Mid-range” can mean very different things, so look at the actual materials and fixtures.
Exclusions
Temporary housing, contingency and any discovered conditions are all stated explicitly above, not folded into one number.
Ask what’s left out, so a partial price doesn’t look like the whole budget.
Every number we publish states its date, its area and scope basis, and what it leaves out, so you can compare it fairly against any quote.
Licensed, and renovating homes in the GTA for over a decade.
- HCRA Licence #48554, licensed, in good standing since October 2020.
- Tarion-registered builder.
- Founded 2015 by Ali Kashani, Founder and CEO.
- 5.0★ on Google (11 reviews, as of September 2026).
Building new, or adding space instead?
This page covers work within your home’s existing footprint. If you are starting from a vacant lot or teardown, or your project adds new square footage, one of these fits better.
Custom Home Building Costs
For a new custom residence planned around the lot, design brief and full construction scope.
Best fit when: the project begins with a vacant lot or rebuild direction.
Home Addition Cost
For rear, side or upper-level expansion connected to an existing home.
Best fit when: the project adds new floor area while retaining part of the house.
Understand what the number represents.
What’s the difference between a standard and a major renovation, in cost terms?
Roughly $150 to $275 per square foot for a standard renovation versus $280 to $450 per square foot for a major one. The line usually falls at whether structural or systems work is involved, not just how many rooms are touched.
Do I have to pay Development Charges on a renovation?
Generally, no. Like an addition, a renovation within your home’s existing footprint is exempt, the charge is tied to new dwelling units and added floor area, not interior work. The exception is a renovation that creates a new, separate legal secondary suite, confirm that specifically with the City.
Can I get the HST rebate on a renovation?
Only if it’s a true full gut renovation, removing or replacing 90% or more of the existing building’s interior, per the CRA’s definition. A standard or major renovation limited to a few rooms usually doesn’t meet that bar. If you’re planning a full gut, this is genuinely worth checking with an accountant.
How much does a kitchen renovation cost?
$25,000 to $75,000 for most projects, with a cosmetic refresh as low as $15,000 and high-end custom work running $100,000 to $150,000 or more.
How much does a basement renovation cost?
$35 to $95 per square foot for a basic finish, $55 to $150 per square foot with a bathroom added, and $90 to $200-plus per square foot for a legal secondary suite, the most consistent basement figure.
What does the permit actually cost for a renovation?
$11.53 per square metre for general interior alterations, or $6.20 per square metre if the work is basement finishing specifically, both with a $214.79 minimum. A Zoning Review fee of $644.38 may also apply depending on the project.
What’s a realistic contingency to budget?
10% for a cosmetic project, 15% for a kitchen, bathroom or whole-home renovation, and 25% or more for a pre-1960 home or a condo, where hidden conditions are more likely once walls or floors are opened.
Does my home’s age change the cost?
Yes. Pre-1960 homes commonly run 25 to 40% over the original budget once walls are opened, knob-and-tube rewiring alone can add $10,000 to $25,000, and mold or asbestos remediation, where present, adds $4 to $18 per square foot depending on which.
Does where in Toronto I live change the cost?
By one estimate, yes, Scarborough, Etobicoke and North York run roughly 10 to 20% lower than downtown or Midtown for comparable scope. Treat this as directional, not a firm rule for your specific project.
Is 2026 a good time to renovate?
Toronto’s Residential Renovation Price Index actually declined slightly in the most recent data available, and Ontario’s broader renovation sentiment index is currently below neutral, both point to a cooler market, not a more expensive one. Cabinet pricing is one exception, tariff impacts have pushed costs up 15 to 25% versus mid-2025.
Is a renovation covered by Tarion’s new home warranty?
Generally, no. Tarion’s statutory warranty applies to new homes, a renovation or addition to an already-occupied home generally falls outside it. Your protection on a renovation comes from your contract, permits and inspections, and your builder directly, not a Tarion claim.
Do I need to budget for somewhere to stay during a full renovation?
For a whole-home gut renovation, in most cases yes. One Toronto renovation cost guide estimates $8,000 to $20,000 for an 8 to 12 week short-term rental, a real cost worth planning for on a project of that scope.
Can a contractor charge more than their written estimate?
Only within limits, and only for agreed changes. Under Ontario’s Consumer Protection Act, if a written estimate is part of your contract, the final price cannot exceed it by more than 10% unless you’ve agreed to new work or a new price. Contracts worth $50 or more must be in writing, and one signed in your home carries a 10-day cooling-off period.
How do I get an accurate cost for my specific renovation?
Start with a property and scope review. Whether your project is scope-based (whole home) or room-based (kitchen, bath, basement), your home’s age and condition, and whether a full gut renovation makes the HST rebate worth pursuing, all factor into a real number.
Get a number built around your actual renovation, not a blended average.
A short property and scope review gives you a real cost range for your specific scope, whether that’s the whole home or one room.