― CHOOSING THE RIGHT SCOPE

How much of the house actually needs to change?

The answer starts with the existing home, not a finished wish list. A property and scope review comes before any design commitment.

Partial renovation

Update a few key rooms without touching the rest.

For a kitchen, bathroom or basement project where the rest of the home stays as it is.

Property review recommended
Whole-home renovation

Layout, systems and finishes need to change together.

For homes where structure, systems or several rooms need work as one coordinated project.

Existing conditions review required
Renovation plus addition

New space and updated existing rooms, as one project.

For projects where the renovation includes added square footage, planned and built together.

Scope development required
― BEFORE DESIGN

What gets checked before a major renovation is designed?

A few early checks tell us what the house can support and which consultants need to be involved. The final answer comes from what’s actually on site and the right professionals.

Existing structure and systems

What the current framing, foundation and major systems can support, and where they can’t.

Access and site conditions

Access for construction, what’s on site now, and any known servicing information.

Areas affected and sequencing

Which rooms or systems are involved, and how work can be sequenced around the rest of the house.

What you want from the project

How much space you need, what matters most, your timeline and your budget.

― WHO’S RESPONSIBLE

Who does what on your project.

A major renovation involves a lot of people, and your contract spells out what each one is responsible for.

Party
Primary contribution
Accountability

ERA Premier / builder

Plans the project, coordinates the build, orders materials and delivers what the agreement says.

HCRA Licence #48554, Tarion-registered

Design & engineering team

Architectural, structural and other professional work relevant to the renovation scope.

Named once they’re hired

Municipality & authorities

Review applications and make the final call. Approval decisions and timing belong to the City and other authorities, not to us.

Toronto Building permit and inspection records

Homeowner

Tells us what matters, makes the selections and signs off on decisions when they’re needed.

Set out in the project agreement

― RENOVATION PROCESS

How a plan becomes a project.

Your schedule and budget get firmer as the property, scope and documents become clearer. The details go into your project agreement.

Review

Property & scope

Confirm what’s changing, what exists today, and the questions that need a closer look.

Plan

Design & feasibility

Coordinate the design with structural input, consultant advice and budget priorities.

Approve

Documents & permits

We prepare the drawings and file the permit applications for you.

Build

Construction

Coordinate trades, sequencing, quality checks and communication as work moves through the house.

Handover

Closeout

Final inspections, paperwork and a proper walkthrough when the work is finished.

― BUDGET PLANNING

What shapes cost before a renovation is priced?

Cost comes from the actual property, scope and documentation, not a generic price per square foot. See the Home Renovation Cost guide for the full methodology.

Scope

Size, structure and rooms

How much of the home is involved, what’s structural, and which rooms or systems are included.

Property

Site and existing conditions

Access, existing systems, hidden conditions and constraints identified during the property review.

Specification

Finishes, systems and complexity

Finish level, material choices and how many trades or specialty items the scope requires.

― RENOVATION DECISIONS

Choices that shape budget, disruption and daily life.

These decisions affect your budget, the build and your daily life, so it’s worth making them early and together.

Structural changes

Which walls, floors or framing are involved, and what that means for engineering and sequencing.

Systems replacement

Whether mechanical, electrical or plumbing systems are being upgraded alongside the visible work.

Sequencing and living arrangements

How work is phased, and whether staying in the home through the project is realistic.

Finishes and procurement

Finish standards, fixtures and items with longer lead times that need early decisions.

― TORONTO PERMITS & APPROVALS

Plan the approval path before construction starts.

Most major renovations in Ontario fall under Part 9 of the Building Code, which governs houses. The exact requirements depend on the property and the proposed scope.

Context

Scope and code review

Identify which parts of the renovation trigger a permit and which need structural engineering sign-off.

Team

Design and consultant documents

Coordinate drawings and engineering input needed for the permit submission.

Submission

Permits and approvals

Submit through the City of Toronto and respond to review comments before construction starts on that scope.

Delivery

Inspections and closeout

We book the required inspections and keep the paperwork in order until the end.

― MAJOR RENOVATION PROJECTS

Completed work, not renderings.

Real ERA Premier renovation projects across Toronto and the GTA.

Major Renovation

Toronto and the GTA

Major Renovation

Toronto and the GTA

Major Renovation

Toronto and the GTA

Major Renovation

Toronto and the GTA

IN THEIR OWN WORDS

What our clients say on Google.

― Major renovation questions

Questions people ask us first.

It depends on which stage of the project affects the rooms you actually live in. Structural work, like removing a load-bearing wall or opening up a floor plan, usually means real disruption for that part of the house, sometimes without water, power or safe access for a stretch of time. A kitchen or bathroom-focused renovation is often manageable to live through, especially when it’s the only area affected at that stage. For a true whole-home renovation touching most rooms and systems at once, moving out for the most invasive phase is usually the more practical choice, even if you move back in once finishes begin. This gets worked out for your specific project and its phasing, not assumed either way from the start.

A renovation works within your home’s existing footprint. An addition adds new square footage. Many projects include both, and that’s normal, it’s handled as one project either way.

Within the existing footprint, yes, subject to zoning and building code requirements for secondary suites. That’s different from a detached garden or laneway suite, which is its own service (see Multiplex Conversion and Garden Suite & Laneway Suite).

Anything found once walls or floors are opened, like hidden structural, moisture or systems issues, along with municipal fees and finish choices above a base allowance. If something unexpected turns up, it gets documented and priced as a change before work continues on that area, instead of being folded quietly into the existing budget.

ERA Premier Group Ltd. is licensed under Ontario’s Home Construction Regulatory Authority, licence number 48554, which you can look up directly on HCRA’s public builder directory. ERA is also a Tarion-registered builder.

― START WITH YOUR RENOVATION

Planning a major renovation?

Share what exists today and what you’d like to change. We’ll take a look and tell you what we’d do next.

― RENOVATION PLANNING GUIDE

What to consider before a major renovation.

A practical look at the decisions that connect the existing home, the scope and the construction plan. Final recommendations should always reflect the current condition of the property and the appointed professional team.

Start with the existing house, not a finished floor plan.

A major renovation responds to more than a list of rooms to change. The existing structure, systems, access and any past work done to the house can influence what’s practical before the design develops.

Beginning with what’s actually there helps separate confirmed information from assumptions, and identifies where structural, mechanical or municipal input may be needed.

Turn what needs to change into a clear scope.

A useful scope explains what’s changing and why, not just a wish list of finishes. It accounts for how rooms connect, how the household actually uses the home, and what has to happen structurally to get there.

Getting this clear early means fewer changes and fewer surprise costs halfway through the project.

Talk about the design and the budget together.

Budget planning gets more useful as the scope, existing conditions and specifications become clearer. Early numbers should show their basis, assumptions and what’s included or excluded, rather than stand in as a final promise.

Checking the cost of design decisions as you go means you can still change your mind while it’s affordable.

Agree who does what before things get busy.

A major renovation brings together the homeowner, the builder, any designers or engineers, trades and the municipality. Clear roles and communication reduce confusion about who prepares information, who decides, and who holds professional responsibility.

It’s all written into your project agreement, and we update it if the scope or the consultants change.