Home additions, built to feel like they were always there
From property review and design coordination to permits and construction, across Toronto and the GTA.
HCRA Licence #48554, in good standing since 2020
Tarion-registered builder
Planning through construction, coordinated as one project
Toronto and the Greater Toronto Area
Which type of addition actually fits the lot?
The answer starts with setbacks, height limits and lot coverage, not a finished wish list. A property and zoning review comes before any design commitment.
Build up without giving up yard space.
For lots already at or near their coverage limit, a second-storey addition adds space without touching the footprint.
Extend the house where the lot allows it.
For rear, side or bump-out additions where remaining lot coverage and setbacks allow ground-level expansion.
Add space below or within the existing structure.
For basement underpinning, garage conversions or sunrooms, which use existing space more than new lot coverage.
What gets checked before an addition is designed?
A few early checks tell us what the property can support and which consultants need to be involved. The final answer comes from what’s actually on site and the right professionals.
Existing structure and foundation
What the existing foundation and framing can support before adding height or square footage.
Access and site conditions
Access for construction, what’s on site now, and any known servicing information.
Setbacks, height and lot coverage
Which addition types the property’s zoning actually allows, confirmed before a design gets drawn.
What you want from the project
How much space you need, what matters most, your timeline and your budget.
Who does what on your project.
A home addition involves a lot of people, and your contract spells out what each one is responsible for.
ERA Premier / builder
Plans the project, coordinates the build, orders materials and delivers what the agreement says.
HCRA Licence #48554, Tarion-registered
Design & engineering team
Architectural, structural and other professional work relevant to the addition.
Named once they’re hired
Municipality & authorities
Review applications and make the final call. Approval decisions and timing belong to the City and other authorities, not to us.
Toronto Building permit and inspection records
Homeowner
Tells us what matters, makes the selections and signs off on decisions when they’re needed.
Set out in the project agreement
How a plan becomes a project.
Your schedule and budget get firmer as the property, scope and documents become clearer. The details go into your project agreement.
Property & scope
Confirm which addition type fits the lot, what exists today, and the questions that need a closer look.
Design & feasibility
Coordinate the design with structural input, consultant advice and budget priorities.
Documents & permits
We prepare the drawings and file the permit applications for you.
Construction
Coordinate trades, sequencing, quality checks and communication as the addition takes shape.
Closeout
Final inspections, paperwork and a proper walkthrough when the work is finished.
What shapes cost before an addition is priced?
Cost comes from the actual property, addition type and documentation, not a generic price per square foot. See the Home Addition Cost guide for the full methodology.
Addition type and size
Which type of addition, how much space, and what rooms or functions it needs to support.
Site and existing conditions
Access, existing structure, foundation capacity and constraints identified during the property review.
Finishes, systems and complexity
Finish level, material choices and how many trades or specialty items the scope requires.
Choices that shape budget, disruption and daily life.
These decisions affect your budget, the build and your daily life, so it’s worth making them early and together.
Addition type
Which of second storey, rear, side, garage, sunroom or underpinning actually fits the lot and the goal.
Structural capacity
What the existing foundation and framing can carry, confirmed by a structural engineer before design is finalized.
Design integration
Matching rooflines, materials and window proportions so the addition reads as part of the house, not attached to it.
Sequencing and living arrangements
How work is phased, and whether staying in the home through construction is realistic.
Plan the approval path before construction starts.
Most home additions in Ontario fall under Part 9 of the Building Code, which governs houses. Setbacks, height limits, lot coverage and Floor Space Index also determine what’s allowed before design starts.
Zoning and code review
Identify which addition types the property’s setbacks, height limits and FSI actually allow.
Design and consultant documents
Coordinate drawings and structural engineering input needed for the permit submission.
Permits and approvals
Submit through the City of Toronto and respond to review comments before construction starts.
Inspections and closeout
We book the required inspections and keep the paperwork in order until the end.
Completed work, not renderings.
Selected ERA Premier projects across Toronto and the GTA.
What our clients say on Google.
Questions people ask us first.
Which type of addition is right for my house?
It depends on your lot coverage, setbacks, height limits and Floor Space Index, along with what the existing structure can support. A second-storey addition and a basement underpinning solve very different space problems and carry different cost and disruption profiles. This gets confirmed in the property and zoning review, not guessed from a floor plan alone.
Can I stay in the house while an addition is being built?
In most cases, yes. Additions typically affect one area of the house at a time, so the rest stays livable. Basement underpinning is the exception most likely to require staying elsewhere for part of the project, given the work involved below the existing floor.
Do I need a permit for a home addition?
Yes, additions almost always require a building permit, and depending on scope, structural engineering sign-off. Zoning matters too: setbacks, height limits, lot coverage and Floor Space Index determine what’s allowed before design even starts.
Does a home addition affect my home's resale value?
Generally, well-executed additions that add genuinely usable space, particularly bedrooms, bathrooms or primary suites, support resale value. The effect depends heavily on the neighbourhood and the quality of execution, so a blanket recoup percentage isn’t published here since it wouldn’t be a meaningful number on its own.
How is an addition different from a garden suite or laneway suite?
An addition extends your existing house. A garden or laneway suite is a separate, self-contained structure on the same property, with its own zoning rules and process. See Fourplex and Garden Suite for that option.
Planning a home addition?
Share what exists today and the space you need. We’ll take a look and tell you what we’d do next.
What to consider before a home addition.
A practical look at the decisions that connect the property, the scope and the construction plan. Final recommendations should always reflect the current condition of the property and the appointed professional team.
Start with the lot, not a finished floor plan.
A home addition responds to more than a wish list of new rooms. Setbacks, height limits, lot coverage, Floor Space Index and the condition of the existing structure all influence which addition type is actually possible before the design develops.
Beginning with what the property allows helps separate what’s realistic from what’s just appealing, and identifies where structural or municipal input is needed.
- Setbacks, height and lot coverage
- Floor Space Index (FSI)
- Existing structure and foundation
- Approval and permit questions
Turn the space you need into a clear scope.
A useful scope explains what the addition needs to do, not just how big it should be. It accounts for how the new space connects to the existing rooms, how the household will actually use it, and what has to happen structurally to get there.
Getting this clear early means fewer changes and fewer surprise costs halfway through the project.
- Rooms and functions needed
- Connection to existing rooms
- Disruption and living arrangements
- Timing across the project
Talk about the design and the budget together.
Budget planning gets more useful as the addition type, existing conditions and specifications become clearer. Early numbers should show their basis, assumptions and what’s included or excluded, rather than stand in as a final promise.
Checking the cost of design decisions as you go means you can still change your mind while it’s affordable.
Agree who does what before things get busy.
A home addition brings together the homeowner, the builder, any designers or engineers, trades and the municipality. Clear roles and communication reduce confusion about who prepares information, who decides, and who holds professional responsibility.
It’s all written into your project agreement, and we update it if the scope or the consultants change.
- Who’s doing what, by name
- Consultant coordination
- When decisions and approvals are due
- Construction communication