Custom homes, built around the property you actually have.
From a teardown or a vacant lot to a finished home, one team for design, permits and construction across Toronto and the GTA.
HCRA Licence #48554, in good standing since October 2020
Tarion-registered builder
Design, permits and construction under one team
Toronto and the Greater Toronto Area
A new home, not a modification of the existing one.
A custom home means a new residence, on a vacant lot or after removing an existing structure that can’t support what the property needs. It’s different from a major renovation (working within an existing home’s footprint, see Major Home Renovations), an addition (new space added to a home that otherwise stays as it is, see Home Additions), and a multi-unit project (a fourplex conversion or a garden suite, see those pages). If your project starts with severing a lot before building, see Land Development & Severance for that step specifically. If you’re not sure which of these describes your project, the first conversation is about the property and the goal, not which page you landed on.
What actually shapes a new home on the lot.
Four zoning rules determine what a specific lot can support, before a floor plan gets drawn. Where a project doesn’t meet these as-of-right, a Committee of Adjustment minor variance is the path forward, the City’s application fee is $2,228.98, plus typically $3,000 to $8,000 for a planning consultant, confirmed during the property and zoning review, not discovered partway through.
Minimum distance from the property line.
Applies on all sides of the structure, and directly shapes the buildable footprint.
How tall the new home can be.
Shapes how much living space fits within the buildable envelope.
Maximum percentage of the lot a building can occupy.
Measured at grade, a hard limit on the footprint’s size.
Total floor area allowed relative to lot size.
The single number that most often decides how much house actually fits.
What a custom home costs before a single stud goes up.
For a single or semi-detached home, the City of Toronto’s Development Charge runs $137,846 to $143,409 per unit, a real cost that applies to new construction specifically and doesn’t apply to a renovation or most additions. The building permit fee is $18.56 per square metre, with a $214.79 minimum. Neither of these is optional, and both are due before or during construction, not at closing. See the Custom Home Building Cost guide for the full cost methodology, tier pricing, and what actually moves the number.
The HST rebate most people don’t know exists.
Ontario’s Enhanced New Housing Rebate, combined with the existing GST/HST New Housing Rebate for owner-built homes, can return up to $80,000 in HST paid, for a home valued up to $1,850,000, if construction starts between April 1, 2026 and March 31, 2027, and is substantially completed before 2030. A new custom home is exactly the kind of project this rebate is built for. Eligibility depends on your specific circumstances, and a qualified accountant needs to confirm and file it, but it’s real money most homeowners planning a custom build don’t realize is available right now.
Licensed builder, registered warranty, on the record.
This is the one service on this site where ERA’s residential licensing applies directly and completely. ERA Premier Group Ltd. is licensed under Ontario’s Home Construction Regulatory Authority, licence #48554, in good standing since October 2020 and searchable directly on HCRA’s public builder directory. As a Tarion-registered builder, a new custom home carries Tarion’s statutory new home warranty: one year on workmanship and materials, two years on a wider set of specified items, and seven years against major structural defects. This is real, government-backed protection that doesn’t exist for a renovation, an addition, or a commercial project, it’s specific to new home construction, which is exactly what this service is.
One coordinated process, from the lot to the keys.
Your schedule gets firmer as the property, zoning and design become clearer. We’ll confirm the details for your project.
Property and zoning review
What the lot can support, setbacks, height, lot coverage and FSI, before design starts.
Design and engineering
Layout and structural design coordinated against buildability, code requirements and the zoning envelope as they’re designed, not after.
Permits and approvals
Building permits, and a Committee of Adjustment application if a variance is needed, coordinated as part of the schedule.
Construction
Trades and sequencing coordinated from foundation to finishes, with quality checks at each stage.
Handover
Tarion warranty documentation, inspections and a documented handover once construction is complete.
Our Latest Projects
Real ERA Premier custom home work.
What our clients say on Google.
Questions people ask us first.
What counts as a custom home versus a major renovation?
A custom home is a new residence, on a vacant lot or after removing an existing structure. A major renovation works within an existing home’s footprint. If your project is a mix of both, that’s normal, and it’s worked out during the property review.
How do zoning rules affect what I can build?
Setbacks, height limits, lot coverage and Floor Space Index (FSI) together decide how much house actually fits on a given lot. These are checked before design starts, so the floor plan is designed to what the lot can support, not adjusted afterward.
What if my project doesn’t meet zoning as-of-right?
A Committee of Adjustment minor variance application is the path forward. The City’s application fee is $2,228.98, plus typically $3,000 to $8,000 for a planning consultant, and it adds real time to the schedule, which is planned for during the property and zoning review.
How much do Development Charges add to a custom home?
For a single or semi-detached home, $137,846 to $143,409 per unit, a real cost specific to new construction. See the Custom Home Building Cost guide for the full breakdown.
Is there a rebate on the HST for building a custom home?
Yes, a real one. Ontario’s Enhanced New Housing Rebate, combined with the existing GST/HST New Housing Rebate for owner-built homes, can return up to $80,000 for a home valued up to $1,850,000, if construction starts between April 1, 2026 and March 31, 2027. A qualified accountant needs to confirm your specific eligibility.
What does Tarion’s warranty actually cover on a new custom home?
One year on workmanship and materials, two years on a wider set of specified items, and seven years against major structural defects, Tarion’s standard coverage for a registered builder’s new home.
How do I verify ERA Premier’s licence?
ERA Premier Group Ltd. is licensed under Ontario’s Home Construction Regulatory Authority, licence #48554, searchable directly on HCRA’s public builder directory, and is a Tarion-registered builder.
Do I need to sever my lot before building a custom home?
Only if your project involves splitting an existing lot into two or more. If that applies, see Land Development & Severance for that process specifically, it’s handled before the custom home design starts.
How long does a custom home project take?
It depends on lot conditions, whether a Committee of Adjustment variance is needed, and the size and complexity of the design. A realistic schedule comes out of the property and zoning review, not a general estimate.
Start with the property, not a floor plan.
A property and zoning review is the fastest way to know what a specific lot can actually support, before time goes into a design that doesn’t fit it.