1
Chat on WhatsApp

Custom home builder · North York

Custom home builder in North York

for lots ready to rebuild.

ERA Premier is a licensed custom home builder and design-build contractor for North York homeowners replacing an older house with a new one. We confirm what your lot allows under Toronto’s zoning, tree and ravine rules, then manage design, permits, the Committee of Adjustment where needed, and new home construction as one project.

Builder licence

HCRA Licence #48554

New home warranty

Tarion-registered builder

Google reviews

5.0★ from 11 reviews

Head office

10520 Yonge St, Richmond Hill

Rebuild or renovate?

Replace the house, keep it, or add to it?

Many North York lots carry a post-war bungalow or side-split that is far smaller than the zoning now allows. The right path depends on the lot, the condition of the house and how much space you need.

Knockdown rebuild

Best when the lot can support a much larger home, or when the structure and systems would need replacing anyway.

Keep the house

Best when the structure is sound and the layout can be reworked without rebuilding from the foundation up.

Add space

Best when you need more room but want to keep the existing footprint, foundation and much of the house.

Before design

What we check on a North York lot before design.

North York rebuilds often stall on details nobody checked early. These six points tell us what the lot allows and which approvals the project needs before any drawings are paid for.

Frontage, depth and survey

A current survey confirms lot size, grades, existing structures and the easements every later decision depends on.

Which zoning by-law applies

Toronto’s city-wide By-law 569-2013 or, on some properties, the former North York By-law 7625, and the limits each sets.

Trees 30 cm and larger

Private trees of 30 cm diameter or more need a permit to injure or remove, and City street trees are protected at any size.

Ravines and valley land

Lots near the Don River valleys can fall under Toronto’s ravine by-law or TRCA regulation, which changes what can be built and where.

The existing house

Demolition, service disconnections and whether any part of the house is worth keeping.

Minor variances

Where the design goes past zoning limits, a Committee of Adjustment application is planned into the schedule from the start.

Toronto rules in North York

Two sets of City rules that shape every North York rebuild.

North York follows City of Toronto by-laws. These two decide more custom home designs here than anything else, and both are checked before design starts.

Trees and ravines

Tree Protection By-law, Chapter 813.

A permit is required to injure or remove a private tree 30 cm or more in diameter, and City-owned street trees are protected at any size. Lots in or beside a ravine can also fall under the Ravine and Natural Feature Protection By-law, Chapter 658.

Applies across the City of Toronto, including North York.

Zoning

Two zoning by-laws, one lot.

Most North York lots are regulated by Toronto’s city-wide Zoning By-law 569-2013, but some properties are still partly governed by the former North York Zoning By-law 7625. The one that applies sets the height, coverage and setback limits the new house must meet.

Check any address on the City’s interactive zoning map.

Neighbourhoods

New custom homes across North York’s neighbourhoods.

Lot sizes, tree cover and grades change from one North York neighbourhood to the next. This is what we plan for in the areas where rebuilds are most common.

Willowdale

Many original post-war bungalows here are being replaced with new custom homes. Lots close to Yonge Street can also sit within the Sheppard–Willowdale Secondary Plan area.

York Mills

Lots near the West Don River valley can include slopes and ravine-protected land, so grading and ravine checks come early.

Hoggs Hollow

Set in the valley around Yonge Street and York Mills Road, with steep grades and ravine land, so ravine and TRCA review can apply.

Bayview Village

Mid-century streets around Bayview Avenue and Sheppard, where the survey and existing trees usually decide how far a new footprint can grow.

Armour Heights

Beside Avenue Road and Highway 401, where lot depth and rear-yard setbacks are the usual limits on a larger home.

Lansing

Close to the Yonge Street subway corridor, where the zoning on your specific street, not the neighbourhood name, sets what a new house can be.

Newtonbrook

North of Finch Avenue around Yonge Street, where lot frontage usually decides between a rebuild and a second-storey addition.

Don Mills

One of Canada’s early planned communities, built in the 1950s, where new homes need to work with curving streets and established lot patterns.

Local project

A custom home we built in North York.

Lawrence Park North is a finished custom residence ERA Premier built on Woburn Avenue in North York, designed with The Homeland and with interiors by ERA Premier. The project page has the full gallery.

Cost context

What shapes the cost of a custom home in North York?

North York custom home construction is priced by the lot and the approvals it needs, not by a postcode multiplier. For current construction ranges by size and finish level, see our Custom Home Building Cost guide.

Lot & demolition

Demolition of the existing house, service disconnections and any grading the lot needs.

Trees

Arborist reports, tree permits for trees 30 cm and larger, and protection hoarding.

Building permit

$18.56 per square metre of floor area, with a $214.79 minimum.

Zoning review

A $644.38 zoning review fee applies to new houses.

Development charges

$137,846 to $143,409 per new unit in Toronto. A replacement house on the same lot is treated differently, so we confirm it for your address.

Committee of Adjustment

A $2,228.98 application fee plus planning support, only if the design needs a variance.

Design & engineering

Finish level, systems and custom details, the largest variable in a luxury home after size.

Specification

Finish level, systems and custom details, usually the largest variable after size.

Committee of Adjustment

When a North York design needs a minor variance.

A new home that goes past a zoning limit, even slightly, needs approval from the Committee of Adjustment before the building permit. We plan for it from the start so it does not surprise the schedule.

Zoning review

Measure the design against the by-law.

Confirm which limits the design exceeds and by how much before anything is filed.

Application

File and notify neighbours.

The City’s application fee is $2,228.98, and owners within 60 metres receive notice of the hearing.

Hearing

North York panel decision.

The Committee of Adjustment’s North York panel hears the application and issues a decision.

Appeal period

Then the building permit.

Decisions can be appealed to the Ontario Land Tribunal within 20 days. Once final, the building permit can proceed.

Other services

Other ways we work in North York.

Some North York lots are better suited to more units, a suite or a renovation than to a single new house. The same team handles each of these.

Multi-unit

Converting a house into multiple legal units where zoning allows.

Secondary suite

A detached suite on the same lot for family or rental income.

Existing home

Whole-home renovations with structure, systems and interiors planned together.

More space

Second-storey and rear additions designed to match the house.

Inside the home

Layout, materials, millwork, lighting and finish coordination.

Property strategy

Lot splits and feasibility for properties with development potential.

North York questions

Building a custom home in North York: common questions.

Straight answers to what North York homeowners ask before replacing a house.

It depends on size, finish level and the lot. On top of construction, budget for demolition, tree work, City permit and zoning review fees, and development charges if the project adds a unit. Our Custom Home Building Cost guide shows current GTA ranges, and a lot review turns them into a number for your address.

In most cases, yes. A knockdown rebuild needs a demolition permit and a building permit, and the new home must meet the zoning limits for your lot. If the design goes past those limits, a minor variance from the Committee of Adjustment is the usual route.

Most properties fall under Toronto’s city-wide Zoning By-law 569-2013, but some are still partly governed by the former North York Zoning By-law 7625. The City’s interactive zoning map shows which applies, and we confirm it during the lot review.

Yes, for any private tree 30 cm or more in diameter under Toronto’s Tree Protection By-law (Chapter 813), and City street trees are protected at any size. Lots near a ravine may also need a permit under Chapter 658.

Timing depends on the hearing calendar for the North York panel and whether the decision is appealed. After a decision, there is a 20-day appeal period to the Ontario Land Tribunal before it becomes final, so we build the process into the schedule early.

Yes. As a design-build custom home builder, we coordinate architecture, engineering, approvals and construction under one team, so the design is checked against the zoning, the budget and buildability as it develops.

Yes. ERA Premier Group Ltd. holds HCRA Licence #48554 and is a Tarion-registered builder, so a new custom home is enrolled in Tarion’s new home warranty.

Yes. North York is one of the areas we serve across Toronto and the GTA, and our office at 10520 Yonge St in Richmond Hill is on the same Yonge Street corridor.

Discuss your North York lot

Send the address. We will tell you what the lot allows.

Share the property address, a survey or drawings if you have them, and what you want to build. We will review the zoning, trees and approvals and suggest the right next step.