Multiplex Builder in Toronto: New Builds and Conversions.
Build a new multiplex from the ground up, or turn the house you already own into separate units. We start with what your lot can legally support, then take it through design, permits and construction as one team.
HCRA Licence #48554, in good standing since 2020
Tarion-registered builder
New builds and conversions, handled by one team
Toronto and the Greater Toronto Area
Build new, convert what is there, or start smaller?
Toronto’s zoning now allows up to four units on residential lots across the city, and up to six in some wards. How you get there depends on the house, the lot and what you want the building to do.
Replace the house with a purpose-built fourplex or sixplex.
Best when the existing house is near the end of its life or doesn’t divide well. Every unit is designed from scratch, with its own entrance, services and layout.
Turn the existing house into separate units.
Best when the structure is sound and the layout can be split. Less demolition, but fire separation and a second way out of every unit shape the whole design.
One secondary suite or a garden suite instead.
For properties or budgets where a full multiplex isn’t the right fit yet. See garden suites and laneway suites for that route.
How many units can your lot support?
Since May 2023, Toronto’s zoning has allowed multiplexes of up to four units as-of-right on residential lots across the city, and in June 2025 Council added six-unit permissions in nine wards. Height, depth, lot coverage and setbacks still apply. A design that meets them goes straight to a building permit, with no Committee of Adjustment hearing.
In October 2026 the City also released free pre-approved fourplex and sixplex designs. They save design time, but a qualified designer still has to adapt them to your lot, and we can build from them.
Unit count and building limits
Confirm how many units your ward allows, plus the height, depth, coverage and setbacks your lot is held to.
Committee of Adjustment, only if needed
If a design goes past the zoning limits, a minor variance adds months. We design to avoid one where we can.
Building permit
Architectural, structural and mechanical drawings go to Toronto Building, and we handle the review comments.
Inspections and occupancy
Inspections through construction, including the fire separations between units, before each unit is handed over.
What gets checked before a multiplex is designed?
These answers decide whether a new build or a conversion makes more sense, and how many units the lot can realistically carry.
Lot, ward and zoning
Frontage, depth and the ward, which together set the unit count and the size of the building.
The existing house
Whether the structure, foundation and basement height can be reused, or whether starting fresh is the better investment.
Servicing
Water, sewer and hydro capacity for every unit, and whether the connections to the street need upgrading.
Access and trees
Room for construction, protected trees, and what the City needs before any demolition or excavation.
New-build multiplex vs. conversion.
Both end with legal, separately serviced units. The route, the risk and the budget are different.
Starting point
A vacant lot, or a house that comes down first.
The existing house and its foundation.
Design freedom
Full. Unit sizes, layouts and entrances are designed from scratch.
Limited by the existing structure, stairs and window positions.
Fire separation and egress
Built in from the first drawing.
Retrofitted into existing walls and floors, often the hardest part.
Servicing
New water, sewer and hydro sized for every unit.
Existing services checked, and usually upgraded.
Main risk
Demolition, a longer schedule and more money up front.
Hidden conditions once walls and floors are opened.
How a lot becomes a multiplex.
The schedule and budget firm up as the zoning, the unit count and the route (new build or conversion) are confirmed. Here is the order the work happens in.
Lot and zoning review
Confirm the unit count your lot allows and what the existing house can offer.
Design and feasibility
Unit layouts with structural, fire and mechanical input, for a new build or a conversion.
Documents and permits
Permit drawings submitted to the City, plus demolition permits where a house comes down.
Construction
Demolition or strip-out, then structure, fire separations and services, unit by unit.
Per-unit closeout
Final inspections, documents and a clear handover for every unit.
What shapes the cost of a multiplex?
Cost and return come from the actual lot, the unit mix and the finish level, not a flat number or an assumed rent roll. We don’t publish a return figure that isn’t tied to a real property.
New build or conversion
A new build costs more up front but gives full control over unit layout. A conversion reuses the structure but carries more unknowns.
Unit count and size
Each unit needs its own kitchen, bathroom, entrance and services, so unit count drives cost faster than square footage does.
Servicing and site conditions
Water, sewer and hydro upgrades, access for equipment, and anything found below grade.
Choices that shape cost, approvals and rentability.
Early decisions matter most when their zoning, construction and rental impact are weighed together.
Unit count and mix
How many units, and whether they are similar in size or a deliberate mix of larger and smaller units.
Live in one, rent the rest?
Owner-occupied multiplexes often plan one larger unit, which changes the layout and the finish budget.
Separation between units
Fire separation and sound control between units, planned into the structure rather than added later.
Separate meters and systems
Whether each unit gets its own heating, hydro meter and water heater, decided before design is final.
What our clients say on Google.
Questions people ask before building.
What's the difference between a multiplex and a multi-unit building?
A multiplex is a house-form building with two to six units, the kind Toronto’s zoning now allows on regular residential lots. Multi-unit is the broader term. It also covers larger low-rise apartment buildings, which follow different zoning and usually the more demanding Part 3 of the Building Code. Our multiplex work covers duplexes through sixplexes, both new builds and conversions.
How many units can I build on my lot in Toronto?
Up to four units as-of-right on residential lots across the city, and up to six in the wards where Council has allowed sixplexes. Height, depth, lot coverage and setbacks still apply, so the real answer comes from a review of your specific lot.
Is it better to convert my house or build a new multiplex?
If the house is structurally sound and divides well, a conversion can cost less. If it’s near the end of its life, or the layout fights every unit, a new build usually gives a better building for the money. We compare both routes on your property before you commit.
Do I need a zoning variance for a multiplex?
Not if the design meets the zoning rules. Then it goes straight to a building permit. A variance is only needed when a design goes past the limits, and we try to design so you avoid one.
Can I use the City's pre-approved multiplex plans?
Yes. Toronto released free pre-approved fourplex and sixplex designs in October 2026. A qualified designer still has to adapt them to your lot and prepare site-specific drawings, and we can build from them.
Is financing available for a multiplex?
Lenders treat multiplexes differently from single homes, and properties with five or more units can qualify for CMHC’s multi-unit programs. Confirm the details with your lender or mortgage broker early, because their requirements can shape the unit count and the design.
How is a multiplex different from a garden or laneway suite?
A multiplex divides or replaces the main building into several units. A garden or laneway suite is a separate, smaller building in the backyard. See garden suites and laneway suites if that fits your property better.
How long does a multiplex project take?
It depends on the route, the approvals and the size of the building. A new build adds demolition and a longer construction phase; a conversion depends heavily on what is found inside the walls. A lot review gives you a realistic schedule before you commit.
Planning a multiplex?
Share the address and what you’d like to build. We’ll review the zoning, tell you whether a new build or a conversion makes more sense, and outline the next step.
What to consider before you build a multiplex.
A practical look at the decisions that connect the lot, the zoning and the construction plan. Final recommendations always reflect the actual property and the appointed design team.
Start with what the zoning allows, not the unit count you want.
A multiplex responds to more than a target number of units. The ward, the lot size, the existing house and the servicing capacity all decide what’s achievable before design begins.
- Ward and unit limits
- Lot size and building envelope
- Existing structure and foundation
- Servicing capacity
Decide between a new build and a conversion early.
The route changes the drawings, the permits, the schedule and the budget. Comparing both on your property before design starts saves you from redesigning halfway through.
- Condition of the existing house
- Unit layouts each route allows
- Demolition and permit path
- Cost and schedule for each option
Talk about the design and the investment together.
Early numbers should show their basis, assumptions and exclusions, rather than stand in as a promised return. Checking design against cost and financing as you go keeps the trade-offs visible.
Agree who does what before things get busy.
A multiplex brings together the owner, the builder, designers and engineers, trades and the City. Clear roles reduce confusion about who prepares information, who decides and who holds professional responsibility.
- Who’s doing what, by name
- Consultant coordination
- When decisions and approvals are due
- Construction communication