Lot severance in Toronto: does your property qualify?
From eligibility review and the Committee of Adjustment process to what comes next, across Toronto and the GTA.
HCRA Licence #48554, in good standing since 2020
Tarion-registered builder
Site review, application and consultant coordination, one process
Toronto and the Greater Toronto Area
Eligibility starts with the lot, not the ambition.
Lot frontage, area, zoning and existing structures determine whether a severance is possible before anything else does. A property review comes before an application.
Enough frontage to create two conforming lots.
For lots that meet or come close to the zoning-required minimum frontage and area for the area.
A second street frontage can support a different split.
For corner lots, where an additional frontage sometimes allows a severance a mid-block lot couldn’t support.
Enough depth to create a lot behind the existing house.
For lots deep enough that a rear severance is worth investigating, subject to access and servicing.
What the Committee of Adjustment process actually involves.
A severance goes through Toronto’s Committee of Adjustment as a consent application, not a building permit. The exact requirements depend on the property and its zoning.
Pre-consultation
Confirm zoning conformity and what the application needs before it’s submitted.
Application & survey
Coordinate the survey, planning justification and supporting documents the consent application requires.
Committee hearing
Submit to the Committee of Adjustment and respond to any conditions or objections raised at the hearing.
Decision & appeal window
A decision is issued, followed by a statutory appeal period before it’s final.
What gets checked before a severance application is filed?
A few early checks tell us whether the property genuinely qualifies and which consultants need to be involved. The final answer comes from a current survey and the right professionals.
Lot dimensions and frontage
Confirmed against current zoning minimums for the area, not assumed from the original lot size.
Zoning conformity
Whether the resulting lots, and any future homes on them, would conform to zoning or need a variance alongside the severance.
Trees, grading and access
Mature trees, grade changes and access requirements that can affect what’s actually buildable on a new lot.
What you want from the project
How much space you need, what matters most, your timeline and your budget.
Who does what on your project.
A severance application involves a lot of people, and your agreement spells out what each one is responsible for.
ERA Premier / builder
Site review, application coordination and consultant management defined in the agreement.
HCRA Licence #48554, Tarion-registered
Design & engineering team
Land survey, planning justification and any variance application relevant to the severance.
Named once they’re hired
Municipality & authorities
Review and decisions within their jurisdiction. The Committee of Adjustment’s decision and timing are set by the City of Toronto, not by ERA.
Committee of Adjustment public hearing records
Homeowner
Priorities, decisions and timely approvals within the agreed process.
Set out in the project agreement
How an application moves through the process.
A real timeline takes shape once zoning conformity and survey information are confirmed. The exact schedule depends on the Committee of Adjustment’s hearing calendar.
Eligibility review
Confirm lot dimensions, zoning conformity and whether a severance is realistic.
Survey & application
Prepare the survey, planning justification and supporting documents the consent application requires.
Committee hearing
Attend the Committee of Adjustment hearing and respond to conditions or objections.
Decision & appeal
Track the decision and the statutory appeal period before it becomes final.
Next steps
Once final, the severed lot is ready for its own building permit and construction process.
What shapes cost before a severance is filed?
Cost comes from the application, survey and consultant work the specific property requires, not a flat number. Once a new lot is ready to build on, the relevant service page covers what construction costs.
Application & consultants
Survey, planning justification and any variance application the property needs.
Site conditions
Lot dimensions, trees, grading and access confirmed during the property review.
Municipal fees
City of Toronto application and notice fees, set by the municipality and subject to change.
Factors that decide whether a severance is realistic.
These factors determine feasibility before design or construction planning begins.
Lot dimensions and frontage
Whether the resulting lots meet current zoning minimums for the area.
Zoning conformity
Whether a variance is needed alongside the severance for either resulting lot.
Trees, grading and services
Mature trees, grade changes and water, sewer or hydro servicing for a new lot.
Neighbouring context
How the severance and any future homes relate to the surrounding lots and streetscape.
What to consider before applying for a severance.
A practical look at the decisions that connect the property, the application and what comes after. Final recommendations should always reflect the current condition of the property and the appointed professional team.
Start with the lot, not the plan.
A severance depends on what the current lot actually is, its dimensions, frontage, zoning designation and physical constraints, more than what you’d eventually like to build. Confirming this against current zoning is the first real step, before any design or construction planning begins.
Beginning with the property itself helps separate what’s realistic from what’s just appealing, and identifies where survey or planning input is needed.
- Lot dimensions and frontage
- Zoning designation
- Trees and grading
- Access and servicing
Confirm eligibility before committing to an application.
A useful eligibility review compares the lot against current zoning minimums and identifies whether a variance would be needed alongside the severance. Getting this clear early avoids preparing an application for a lot that doesn’t actually qualify.
This is the step that turns an assumption about the property into a real answer.
- Zoning conformity
- Variance requirements
- Servicing capacity
- Neighbouring context
Prepare for the Committee of Adjustment hearing.
The survey and planning justification are prepared, the application is submitted, and a public hearing date is set. Being ready to respond to conditions or neighbour objections at the hearing is part of a realistic application timeline.
The decision that follows starts a statutory appeal period before it’s final.
Plan what the severed lot makes possible.
Once a severance is approved, each lot can move forward on its own path: a new custom home, a renovation of the existing structure, or additional density where zoning allows. This is set out once the decision is final, not assumed beforehand.
The severance itself doesn’t include construction, it establishes the lots construction can then happen on.
- Custom home construction
- Renovate the existing structure
- Added density options
- Construction timeline
What our clients say on Google.
Questions people ask before applying.
What is a lot severance, and how is it different from a subdivision?
A severance, also called a consent, splits an existing lot into two or three new lots through Toronto’s Committee of Adjustment. A subdivision plan is a separate, larger process typically used for creating four or more lots, and goes through a different provincial planning process. Which one applies depends on how many new lots are being created.
How do I know if my lot is eligible for severance?
Eligibility depends on whether the resulting lots would meet the zoning by-law’s minimum frontage and area for the area, along with servicing, access and any site-specific constraints like mature trees or grade. A property review looks at the actual lot against current zoning before an application is prepared.
What does the Committee of Adjustment process involve?
A survey and planning justification are prepared and submitted to the Committee of Adjustment, which holds a public hearing where neighbours and the public can comment. The Committee then issues a decision, followed by a statutory appeal period before it becomes final.
How long does a severance application take?
Timing depends on the Committee of Adjustment’s hearing schedule and whether the decision is appealed, so it varies by property and by when in the year the application is filed. A realistic estimate comes once pre-consultation confirms what the specific application needs.
What happens after a severance is approved?
Once the decision is final, each new lot can proceed independently, whether that means a new custom home, keeping and renovating the existing structure, or another project entirely. The severance itself doesn’t include construction, it establishes the lots construction can then happen on.
Wondering if your lot can be severed?
Share the property and what you’re hoping to do with it. We’ll take a look and tell you what we’d do next.